Välkommen till Old West Iron
Huvudmeny
-
Fasteners
- Fasteners
-
Decorative Screws
-
Lag Screws / Lag Bolts (pointed tip)
-
Machine Bolts / Carriage Bolts (Threaded for nut)
-
Nuts & Washers
-
Clavos & Rosettes
-
Tensioning & Rigging Hardware
-
Builder Supplies
- Builder Supplies
-
Metal Brackets
-
Post & Beam Hardware
-
Truss Brackets
-
Support Brackets & Hangers
-
Railing, Fencing & Footrails
-
Tensioning & Rigging Hardware
-
Door Hardware
- Door Hardware
-
Handles, Knobs & Knockers
-
Hinges and Hinge Straps
-
Latches, Locks & Cane Bolts
-
Speakeasy Doors & Grills
-
Decorative Straps & Kickplates
-
For The Home
- For The Home
-
Wall Accessories
-
Window Accessories
-
Fireplace & Hearth
-
Kitchen
-
Bathroom
-
Outdoor Living
- Outdoor Living
-
Pizza Oven Doors
-
Outdoor Kitchen
-
Home Exterior / Curb Appeal
-
Garden & Yard
-
Ranch, Farm & Barn
-
Gifts & Misc
- Gifts & Misc
-
Seasonal / Gifts
-
Miscellaneous
-
Help Center
Din kundvagn
-
Shop by Design Style
-
Shop by Room
Shop By
-
Shop by Design Style
-
Shop by Room
48-Hour Best Seller Sale
Our most popular hand-forged hardware is 12% off, today only.
⚒️ Made in America
🇺🇸 Veteran-Powered
🔥 No extensions. Once it’s gone, it’s gone.
12% off
Best Seller Sale
Change Order Fee
$22.00 CAD
Backed by our 100% Quality Guarantee
If a piece arrives defective or damaged, we’ll replace it.
Hand-forged in Idaho by American blacksmiths. Every piece is individually crafted for authentic Old-World durability.
Lead Time:
Shipping Information
Shipping delivery time frame is different than lead time / production time.
Free Shipping on Domestic Orders $60+
Flat Rate Shipping on Domestic Orders:
$19.99 and under $9 Shipping
$39.99 and under $12 Shipping
$59.99 and under $12 Shipping
Dela:
$22.00 CAD
$22.00 CAD
$22.00 CAD
This fee applies to all changes made to an existing order 24 hours or more after the original order was placed. This fee is cumulative and may be charged each time an order needs to be adjusted or altered after the allotted 24 hours.
Veteran-Powered
US Army Veteran Blacksmiths, American Grit in Every Strike
Original Designs
Historically Inspired, Uniquely Ours.
From Our Family Forge
Crafted by Multi-Generational Family Blacksmiths
Authencity Guaranteed
We only sell authentic products from verified brand partners and retail partners globally.
Matching Textures & Finishes
Need Fasteners?
Från $40.00 CAD
Från $29.00 CAD
Från $4.00 CAD
Från $3.00 CAD
Från $4.00 CAD
Från $3.00 CAD
Från $2.00 CAD
Från $9.00 CAD
Från $11.00 CAD
Från $14.00 CAD
Från $3.00 CAD
Från $37.00 CAD
Från $39.00 CAD
Från $4.00 CAD
Från $6.00 CAD
Från $16.00 CAD
Från $4.00 CAD
$1.00 CAD
Från $92.00 CAD
Från $9.00 CAD
Från $2.00 CAD
Från $2.00 CAD
Från $2.00 CAD
- Att välja ett alternativ resulterar i en fullständig siduppdatering.
- Öppnas i ett nytt fönster.